Barrie Property History Reports
Barrie property history reports list every building permit the City of Barrie has issued for the address from 2018 to the present, each with the status the City publishes and the date it was issued. They add the zone under By-law 2009-141, whether the property is inside the Lake Simcoe Region or Nottawasaga Valley Conservation Authority regulated area, any Municipal Heritage Register entry, and the nearest fire hall and hydrant. The City publishes issuance records only, so whether a permit was finished or closed is not shown.
What's Included in a Barrie Property History Report
Every Issued Permit Since 2018, With Its Issuance Date
Every issued building permit the City publishes for the address: the permit number, its type as the City publishes it, the work description as published, the status (Issued or Conditional Issued) and the date it was issued. The City publishes issuance records only, so no permit is shown as closed, completed or still open.
Zoning Under By-law 2009-141
The zone code and the City's name for it, taken at the address point from the in-force zoning by-law layer or the annexed-lands layer for the south of the city. A site-specific exception or a holding reference is shown exactly as the City publishes it. Where no zoning polygon covers the address, the report says zoning is not available.
The Conservation Authority Regulated Area
Whether the property is inside the regulated area of the Lake Simcoe Region Conservation Authority or the Nottawasaga Valley Conservation Authority, as the City republishes the limits. It is a regulated area, not a floodplain map.
Heritage Register, Fire Hall, Hydrant and Mains
Any entry for the property on the City of Barrie Municipal Heritage Register, with the register's own status, by-law and dates. The straight-line distance to the nearest of the City's six fire halls, the nearest public hydrant with its install date, and the install date, material and size of the water, sanitary and storm mains within 30 metres of the address.
What a Barrie Report Does Not Cover
Permit completion or closing status is not published by the City and is not shown. Year built is shown only where a City permit to construct the home is on record, dated from that permit; assessed value is held by MPAC and is not shown. The report does not show construction value, dwelling units, hydrant flow ratings, owners, applicants or contractors, or applications still under review.
Contains information licensed under the Open Government Licence – Barrie.
Coverage Area
Property Proof reports addresses across the City of Barrie, including Allandale, Painswick, Holly and Ardagh. Addresses outside the City, including neighbouring Innisfil and Springwater, are not covered.
Frequently Asked Questions
What is a property history report in Barrie?
A property history report compiles the City of Barrie's public records for an address into a single document: every issued building permit since 2018 with its issuance date, the zone under By-law 2009-141, the conservation authority regulated area, any heritage register entry, and the nearest fire hall and hydrant.
How far back do Barrie permit records go?
The City's issued building permit register is published from 2018 to the present, and the report lists every issued permit at the address that the City publishes.
Does the report say whether a permit was completed or closed?
No. The City publishes issuance records only: every permit reads Issued or Conditional Issued with the date it was issued, at any age. The report never calls a permit closed, completed or still open.
Does the Barrie report show zoning?
Yes. It shows the zone code and the City's name for it under By-law 2009-141, with any exception or holding reference exactly as the City publishes it. Where no zoning polygon covers the address, zoning is shown as not available.
Does the report say whether a property is in a floodplain?
No. It says whether the property is inside the Lake Simcoe Region or Nottawasaga Valley Conservation Authority regulated area, which is not a floodplain map.
Does the Barrie report show year built or assessed value?
Year built is shown where a City permit to construct the home is on record, dated from that permit and labelled as such; the permit record begins in 2018, so an older home may show none. Assessed value is held by MPAC and is not shown.
What is not included in a Barrie report?
Permit completion status, permits issued before 2018, applications under review, assessed value, construction value, dwelling units, hydrant flow ratings, and owners, applicants and contractors.