PropertyProof

Kelowna Property History Reports

Kelowna property history reports list every building permit the City of Kelowna's register holds for the address, from 1995 to the present, each with the status the City publishes and the date the City approved it. They add the zone and its purpose under Zoning Bylaw No. 12375, whether the by-law permits a secondary suite in that zone, any heritage or development permit area the City maps for the property, and the nearest fire hall, hydrant and mains. Every report states the date its permit list is good through.

What's Included in a Kelowna Property History Report

Every Permit in the City's Register, With Its Approval Date

Every permit the register lists for the address: the permit number, its subtype as the City publishes it, the work description as written, the status word the City publishes, the date the City approved it (or a plain statement that the register has none), the City's own Open or Closed flag, and the construction value the City states. The report is good through the newest approval in the register as Property Proof last ingested it, says so, and checks the City's register for newer records when it is generated.

Zoning Under Bylaw No. 12375, and the Secondary-Suite Finding

The zone code and the City's name for it, taken at the address point, with the purpose Zoning Bylaw No. 12375 states for the zone and any sub-zone exactly as the City's map publishes it. For each zone the report says whether the by-law permits a secondary suite, does not permit one, or does not state a rule for the zone, with the by-law's condition and floor-area limit where it is permitted. The finding is for the zone, not for a sub-zone or a site-specific regulation.

Heritage and the Floodplain Development Permit Area

The City's Heritage Registry, Heritage Designation Properties (with the bylaw reference) and Heritage Conservation Areas are three separate sources, and each appears on its own line only where the property is in it. Where the property lies in the area the City's Official Community Plan names the Floodplain development permit area, the report says so in the City's own words. That is a policy overlay, not a flood hazard assessment.

Fire Hall, Hydrant and Mains

The straight-line distance to the nearest of the seven operating Kelowna fire halls, the nearest hydrant with its install date, and the City's water, sanitary and storm mains within 30 metres with their install year and material. A main that is not found within that distance is stated as not found, not as a servicing conclusion.

What a Kelowna Report Does Not Cover

Assessed value is held by BC Assessment and is not shown. Year built is shown only where a City permit to construct the home is on record, as an estimate dated from that permit. The City does not publish what its permit statuses mean, so the report does not say that work was finished or inspected. Permits approved after the good-through date will not appear.

Contains information licensed under the Open Government Licence – City of Kelowna

Coverage Area

Property Proof reports addresses across the City of Kelowna, including Downtown, Pandosy Village, Glenmore, Rutland, the Mission neighbourhoods and Black Mountain. Addresses outside the City, including West Kelowna and Lake Country, are not covered.

Frequently Asked Questions

What is a property history report in Kelowna?

A property history report compiles the City of Kelowna's public records for an address into a single document: the permits in the City's register, the zone and its by-law purpose, a secondary-suite finding, the heritage and development permit area lines, and the nearest fire hall, hydrant and mains.

How far back do Kelowna permit records go?

The City's building permit register runs from 1995 to the present. Each report states the date its permit list is good through, and a permit approved after that date will not appear.

How current is the permit list?

Property Proof keeps its own dated copy of the City's register and each report is good through the newest approval in it. When a report is generated it also checks the City's register for newer records and says what it found. If the City's newest approval is more than 45 days old, the report says the register may not be current, because the City does not state how often it is maintained.

Does the report say whether a permit was completed?

No. It shows the status word the City publishes and the City's own Open or Closed flag, but the City does not publish what each status means, so the report does not say the work was finished or inspected.

Does the report say whether I can have a secondary suite?

It says what Zoning Bylaw No. 12375 states for the zone: permitted (with the by-law's condition and floor-area limit), not permitted, or not stated for that zone. It is a finding for the zone, not for the lot: sub-zones and site-specific regulations can change it, so confirm with the City.

Does the report say whether a property is in a floodplain?

No. It says whether the property lies within the Floodplain development permit area in the City's Official Community Plan, which is a policy overlay and not a flood hazard assessment.

Does the Kelowna report show year built or assessed value?

Assessed value is not shown: it is held by BC Assessment. Year built is shown only where a City permit to construct the home is on record, dated from that permit and labelled an estimate; otherwise it is unavailable.

Search a Kelowna address View Kelowna sample report FAQ & Coverage